Generator
Generator
Observe notes on contact corrosion. Refer to => [ Contact Corrosion ] Contact Corrosion.
Removing
- With ignition switched off, disconnect battery Ground (GND) wire. Refer to => [ Battery, Disconnecting and Connecting ] Battery, Disconnecting and Connecting.
- Drain coolant.
- Move lock carrier to service position. Radiator Support
- Remove the front engine cover - arrow 1 - and - arrow 2 -.
- Remove screws - arrows -.
- Remove air guides - 1 - and - 2 -.
- Disconnect vacuum line - 2 -.
- Disconnect connector - 1 - for mass airflow sensor (G70).
- Remove air guide hose, to do so release hose clamp - 3 - and open clips - arrows -.
- Open clips - arrows - and remove upper air filter housing.
- Disconnect vacuum line - 1 -.
- Remove pin of expanding clip - 4 -.
- Remove lower air filter housing and disconnect electrical harness connector - 2 - at rear from intake air switch-over valve (N335).
- Remove hose - 3 - to Secondary Air Injection pump.
- Remove lower air filter housing.
- With air suspension: remove the bracket and air supply assembly.
- Remove bolt - 2 - and remove bracket.
- Pull water pipes out of generator.
- Disconnect electrical wires - 1 - and - 3 - from generator.
CAUTION!
Risk of destroying if the running direction of a used ribbed belt is reversed.
• Before removing ribbed belt, marking running direction with chalk or a felt-tip pen for reinstallation.
- Loosen clamping bolt - arrow - and remove ribbed belt.
- Remove bolts - arrows - and remove tensioner roller.
- Remove bolts - arrows -.
• If generator is stuck in its bracket, screw in mounting bolts again except 2 rotations.
• Carefully strike on bolt heads using flat side of hammer - doing this loosens sleeves of generator mount.
- Remove generator.
Installing
Install in reverse order of removal, observing the following:
• Secure all hose connections using standard hose clamps.
• Replace O-ring
- Slightly drive back sleeves for retaining bolts in order for easier installation of generator.
• Tight sleeves for generator mount must be made smooth-running, otherwise clamping force of sleeve is too little despite correct torque.
- Place ribbed belt - 2 - over belt pulleys in the specified sequence.
1 Generator
3 Idler pulley
4 Vibration damper
5 Tension roller
• When installing ribbed belt, be sure that it is seated correctly on belt pulleys.
- Install lock carrier with attachments.
- With air suspension: install the bracket and air supply assembly.
- Connect battery. Required actions => [ Vehicles with : ] Battery, Disconnecting and Connecting.
- Fill coolant.
- Start engine and check belt routing.
Tightening Specifications