Operation CHARM: Car repair manuals for everyone.

Crankshaft: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace16.49.3AIncludes: R&R Engine.
Note
With AC, Add1.00.7A
To R&R Cylinder Head, Add
One Bank3.22.3A
Both Banks4.33.1A
To Replace Piston Rings, Add
One Cylinder0.70.4A
All Cylinders2.82.0A
To Replace Connecting Rod, Add
One Cylinder0.50.3A
All Cylinders2.01.4A
To Replace Piston, Add
One Cylinder0.90.6A
All Cylinders4.53.2A
With Locking Wheel Covers, Add0.20.1A
With Locking Lug Nuts, Add0.20.1A