| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes |
| Replace |
| Note |
| To Grind Valves, Add |
| One CYL |
| One Bank | 0.5 | 0.3 | A | |
| Both Banks | 1.1 | 0.8 | A | |
| To Replace Main Bearings, Add | 1.4 | 1.0 | A | |
| Add Following Operations If Performed With Piston & Ring Jobs |
| Main Bearings, Renew | 1.6 | 0.0 | A | |
| Crankshaft | 5.0 | 0.0 | A | |
| Oil Pump, Renew | 0.8 | 0.0 | A | |
| Timing Chain or Gears, Renew | 1.3 | 0.0 | A | |
| Tune Up | 0.8 | 0.0 | A | |
| One CYL |
| Right Bank | 11.6 | 8.3 | A | Includes: R&R Cylinder Head & Oil Pan, Remove Carbon. |
| Left Bank | 11.8 | 8.4 | A | Includes: R&R Cylinder Head & Oil Pan, Remove Carbon. |
| Both Banks | 14.8 | 10.6 | A | Includes: R&R Cylinder Head & Oil Pan, Remove Carbon. |
| All Cyls |
| Right Bank | 14.1 | 10.1 | A | Includes: R&R Cylinder Head & Oil Pan, Remove Carbon. |
| Left Bank | 14.3 | 10.2 | A | Includes: R&R Cylinder Head & Oil Pan, Remove Carbon. |
| Both Banks | 19.9 | 14.2 | A | Includes: R&R Cylinder Head & Oil Pan, Remove Carbon. |
| Each Additional | 0.9 | 0.6 | A | Includes: R&R Cylinder Head & Oil Pan, Remove Carbon. |