| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes |
| Resurface/Grind |
| Both Heads | 12.2 | 0.0 | A | Includes: R&R Cylinder Heads, Clean Carbon And Make All Necessary Adjustments. |
| Add the Following Operations If Performed With Valves, Grind |
| Valve Guides, Knurl |
| Each | 0.1 | 0.0 | A | Add The Following Operations If Performed Along With Valve Grind. |
| Valve Guides, Renew |
| Each | 0.2 | 0.0 | A | Add The Following Operations If Performed Along With Valve Grind. |
| NOTE |
| To Ream Guide, Add | 0.1 | 0.0 | A | Add The Following Operations If Performed Along With Valve Grind. |
| Rocker Arm & Shaft Assembly, Overhaul |
| Each Shaft | 0.5 | 0.0 | A | Add The Following Operations If Performed Along With Valve Grind. |
| Valve Lifters, Renew | 1.8 | 0.0 | A | Add The Following Operations If Performed Along With Valve Grind. |
| Timing Chain | 1.2 | 0.0 | A | Add The Following Operations If Performed Along With Valve Grind. |
| Camshaft, Renew | 3.0 | 0.0 | A | Add The Following Operations If Performed Along With Valve Grind. |
| Tune-Up | 0.6 | 0.0 | A | Add The Following Operations If Performed Along With Valve Grind. |