Operation CHARM: Car repair manuals for everyone.

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
Add Following Operations If Performed With Piston & Ring Jobs
Main Bearings, Renew1.00.0A
Crankshaft, Renew5.60.0A
Oil Pump, Renew0.50.0A
Oil Pump Screen, Clean0.20.0A
Rear Main Oil Seal, Renew
Manual Trans2.60.0A
Auto Trans2.40.0A
Timing Chain, Renew1.80.0A
Tune-Up0.60.0A
Note
To Grind Valves, Add2.82.0A
One CYL
Right Bank10.87.7AIncludes: R&R Cylinder Head & Oil Pan, hone Cylinder Walls And Plastigage Bearings.
Left Bank9.76.9AIncludes: R&R Cylinder Head & Oil Pan, hone Cylinder Walls And Plastigage Bearings.
Both Banks13.69.7AIncludes: R&R Cylinder Head & Oil Pan, hone Cylinder Walls And Plastigage Bearings.
Each Additional0.70.4AIncludes: R&R Cylinder Head & Oil Pan, hone Cylinder Walls And Plastigage Bearings.
All Cyls
Right Bank11.98.5AIncludes: R&R Cylinder Head & Oil Pan, hone Cylinder Walls And Plastigage Bearings.
Left Bank10.87.7AIncludes: R&R Cylinder Head & Oil Pan, hone Cylinder Walls And Plastigage Bearings.
Both Banks15.511.1AIncludes: R&R Cylinder Head & Oil Pan, hone Cylinder Walls And Plastigage Bearings.