Piston: Labor Times
| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes | |
| Replace | ||||
| Note | ||||
| To Grind Valves, Add | 2.8 | 2.0 | A | |
| Add Following Operations If Performed With Piston & Ring Jobs | ||||
| Main Bearings, Renew | 1.0 | 0.0 | A | |
| Crankshaft, Renew | 5.6 | 0.0 | A | |
| Oil Pump, Renew | 0.5 | 0.0 | A | |
| Oil Pump Screen, Clean | 0.2 | 0.0 | A | |
| Rear Main Oil Seal, Renew | ||||
| Manual Trans | 2.6 | 0.0 | A | |
| Auto Trans | 2.4 | 0.0 | A | |
| Timing Chain, Renew | 1.8 | 0.0 | A | |
| Tune-Up | 0.6 | 0.0 | A | |
| One CYL | ||||
| Right Bank | 10.8 | 7.7 | A | |
| Left Bank | 9.7 | 6.9 | A | |
| Both Banks | 13.6 | 9.7 | A | |
| All Cyls | ||||
| Right Bank | 12.7 | 9.1 | A | |
| Left Bank | 13.0 | 9.3 | A | |
| Both Banks | 17.2 | 12.3 | A | |
| Each Additional | 1.0 | 0.7 | A |