Operation CHARM: Car repair manuals for everyone.

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
One CYL
Front Bank7.35.2AIncludes: R&R Cylinder Head, Oil Pan & Plastigage Bearings.
Rear Bank8.05.6AIncludes: R&R Cylinder Head, Oil Pan & Plastigage Bearings.
Both Banks8.86.4AIncludes: R&R Cylinder Head, Oil Pan & Plastigage Bearings.
Each Additional1.00.7AIncludes: R&R Cylinder Head, Oil Pan & Plastigage Bearings.
Add Following Operations If Performed With Piston & Ring Jobs
Main Bearings, Renew1.00.0A
Oil Pump, Renew1.70.0A
Oil Pump Screen, Clean0.20.0A
Rear Main Oil Seal, Renew
Manual Trans1.40.0A
Auto Trans1.80.0A
Timing Belt, Renew0.70.0A
Tune-Up0.50.0A
Note
With AC, Add0.40.2A
To Grind Valves, Add
One CYL0.70.4A
All Cyls5.03.6A
To Replace Cylinder Heads, Add
One Bank2.71.9A
Both Banks5.33.8A