Instrument Panel Duct - Installation
INSTALLATION
1. Position the left and right side instrument panel ducts (2 and 4) and the center distribution duct (3) to the instrument panel (5).
2. Install the screws (1) that secure the left and right side instrument panel ducts and the center distribution duct to the instrument panel. Tighten the screws to 2 Nm (17 in. lbs.).
3. Install the instrument panel assembly Instrument Panel - Installation.
4. Reconnect the negative battery cable.