Operation CHARM: Car repair manuals for everyone.

Piston Ring: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
All Cylinders10.87.4AIncludes: Hone Cylinder Walls And Plastigage Bearings. After Engine Removed.
Note
To Renew Crankshaft, Add3.00.0A
To Renew Main Bearings, Add0.70.0A
To Renew Piston, Pin or Connecting Rod, Add
One0.20.0A
Each Additional0.10.0A
All0.90.0A
To Renew Valve Lifters, Add
One Bank2.00.0A
Both Banks3.90.0A
To Renew Oil Pump, Add5.10.0A
To Clean Oil Pump Screen, Add0.20.0A
To Renew Camshaft, Add
Right Bank3.00.0A
Left Bank3.10.0A
Both Banks3.40.0A
To Perform Tune-Up, Add0.90.0A
One Cylinder
One Bank5.94.2AIncludes: Hone Cylinder Walls And Plastigage Bearings. After Engine Removed.
Both Banks7.35.1AIncludes: Hone Cylinder Walls And Plastigage Bearings. After Engine Removed.