| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes |
| Overhaul/Rebuild |
| Auxiliary Valve | 2.8 | 0.0 | B | Includes: R&R Valve Cover & Adjust Valves. Cylinder Head On Engine. |
| Resurface/Grind | 7.6 | 0.0 | A | Includes: R&R Cylinder Head, Clean Carbon, Grind All Valves & Seats And Make All Necessary Adjustments. |
| Add the Following Operations If Performed With Valves, Grind |
| Tune-Up | 0.5 | 0.0 | A | |
| Valve Guides, Ream |
| Each | 0.1 | 0.0 | A | |
| Valve Guides, Renew |
| Each | 0.3 | 0.0 | A | |
| Rocker Arm Shaft, Overhaul | 1.3 | 0.0 | A | |
| Each Shaft | 0.5 | 0.0 | A | |
| Note |
| With AC, Add | 0.4 | 0.0 | A | |
| With PS, Add | 0.2 | 0.0 | A | |