Operation CHARM: Car repair manuals for everyone.

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
One Cylinder
Right Bank11.90.0AIncludes: R&R Cylinder Heads & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Left Bank11.90.0AIncludes: R&R Cylinder Heads & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Each Bank13.60.0AIncludes: R&R Cylinder Heads & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
All Cylinders20.70.0AIncludes: R&R Cylinder Heads & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Add Following Operations If Performed With Piston & Ring Jobs.
Main Bearings, Renew2.50.0A
Crankshaft, Renew4.40.0A
Oil Pump, Renew1.50.0A
Oil Pump Screen, Clean0.20.0A
Rear Main Seal, Renew1.40.0A
Camshaft, Renew2.80.0A
Rocker Arms, Renew0.80.0A
Timing Chain, Renew1.80.0A
Valve Lifters, Renew1.30.0A
Tune-Up0.70.0A