Operation CHARM: Car repair manuals for everyone.

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
One13.29.4Includes: R&R Cylinder Head & Oil Pan. Hone Cylinder Wall And Plastigage Bearings.
All16.812.0Includes: R&R Cylinder Head & Oil Pan. Hone Cylinder Wall And Plastigage Bearings.
Add Following Operations If Performed With Piston & Ring Jobs.
Main Bearings, Renew4.50.0AAdd Any Of The Following Operations If Performed Along With Piston Or Ring Operations.
Crankshaft, Renew5.00.0AAdd Any Of The Following Operations If Performed Along With Piston Or Ring Operations.
Oil Pump, Renew3.30.0AAdd Any Of The Following Operations If Performed Along With Piston Or Ring Operations.
Oil Pump Screen, Clean0.20.0AAdd Any Of The Following Operations If Performed Along With Piston Or Ring Operations.
Rear Main Oil Seal, Renew1.90.0AAdd Any Of The Following Operations If Performed Along With Piston Or Ring Operations.
Timing Belt, Renew0.60.0AAdd Any Of The Following Operations If Performed Along With Piston Or Ring Operations.
Camshaft, Renew1.70.0AAdd Any Of The Following Operations If Performed Along With Piston Or Ring Operations.