Operation CHARM: Car repair manuals for everyone.

Piston Ring: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
All Cylinders20.814.4AIncludes: R&R Cylinder Heads & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Note
To Renew Crankshaft, Add7.50.0A
To Renew Main Bearings, Add2.20.0A
To Renew Piston, Pin or Connecting Rod, Add
One0.20.0A
Each Additional0.10.0A
All0.90.0A
To Renew Valve Lifters, Add
Right Bank1.90.0A
Left Bank2.20.0A
Both Banks4.00.0A
To Renew Oil Pump, Add2.90.0A
To Clean Oil Pump Screen, Add0.20.0A
To Renew Timing Chain, Add
Right Bank2.90.0A
Left Bank2.90.0A
Both Banks3.20.0A
To Renew Rear Main Oil Seal, Add1.80.0A
To Perform Tune-Up, Add0.90.0A
One Cylinder
Right Bank15.711.4AIncludes: R&R Cylinder Heads & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Left Bank15.711.4AIncludes: R&R Cylinder Heads & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Both Banks16.712.1AIncludes: R&R Cylinder Heads & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.