Connecting Rod: Labor Times
| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes | |
| Replace | 10.8 | 7.4 | A | Includes: R&R Cylinder Head & Oil Pan. Hone Cylinders & Plastigauge Bearings. R&R Engine On 1994-96 Models Only. |
| Add Following Operations If Performed With Pstn & Ring Jobs | ||||
| Crankshaft, Renew | 6.6 | 0.0 | A | |
| Main Bearings, Renew | 6.6 | 0.0 | A | |
| Oil Pump, Renew | 1.3 | 0.0 | A | |
| Timing Belts. Renew | 1.1 | 0.0 | A | |
| Tune-Up | 0.5 | 0.0 | A | |
| Note | ||||
| With AC, Add | 0.2 | 0.1 | A | |
| With PS, Add | 0.4 | 0.2 | A |