Installation
Front Door Belt MoldingINSTALLATION
NOTE: The procedures described below are for the RH side. Unless otherwise specified, the LH side and the RH side follow the same steps.
1. Installation of the front door glass weather strip ASSY OUT RH
1. Fit in the tabs, and install the new front door glass weather strip ASSY OUT RH.
2. Install the screw.
2. Installation of the front door service hole cover RH
3. Installation of the power window regulator master switch ASSY W/ front arm rest base panel UPR RH (driver side door)
4. Installation of the power window regulator switch ASSY W/ front arm rest base panel UPR LH (passenger side door)
5. Installation of the front door trim board SUB-ASSY RH (driver side door)
6. Installation of the door arm rest cover RH
7. Connection of the battery ground terminal
Standard value: T = 6.0 N.m {61 kgf.cm} {4.4 ft / lbf}
8. Settings when removing/installing battery terminals
9. Power window registration settings
10. Function inspection of the power windows