Operation CHARM: Car repair manuals for everyone.

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
Belt Driven
All11.88.4Includes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigauge Bearings.
Note
With PS, Add0.50.3A
Add Following Operations If Performed With Piston & Ring Jobs
Main Bearings, Renew5.60.0AAdd The Following Operations If Performed Along With Piston Or Ring Operations.
Crankshaft, Renew5.60.0AAdd The Following Operations If Performed Along With Piston Or Ring Operations.
Oil Pump Screen, Clean0.20.0AAdd The Following Operations If Performed Along With Piston Or Ring Operations.
Timing Belt, Renew0.50.0AAdd The Following Operations If Performed Along With Piston Or Ring Operations.
Tune Up0.50.0ASee Valves, Grind (Head Removed) And Combinations.
All Cyls
Note
With AC, Add0.70.4A
Add Following Operations If Performed With Piston & Ring Jobs
Main Bearings, Renew8.70.0A
Crankshaft, Renew8.70.0A
Oil Pump, Renew3.40.0A
Oil Pump Screen, Clean0.20.0A
Tune Up0.60.0A